Along with the years of entrepreneurial journey of Zhongyuan people, she gradually formed her own spiritual pillar and behavioral norms. In the silent inheritance, she guided Zhongyuan Company towards a more brilliant tomorrow.
List of main equipment for anti-corrosion steel pipes of Zhongyuan Pipeline Manufacturing Co., Ltd
keyword Zhongyuan Pipeline Manufacturing Co., Ltd Category Anti-coating pipe quality Related products Get a quoteNo. | Equipment name | quantity | Specification and model | Main performance (functions) |
1 | Outer wall shot blasting rust removal machine | 2 | 219-2620 | A. Derusted steel pipe diameter ≤ 3620mm |
B. The maximum weight of a single steel pipe is 20t | ||||
C. Rust removal speed 0.1-5m/min | ||||
D. Performance description: It consists of input and output roller conveyors, shot blasting chambers, throwing wheels, sanding devices, bucket elevators, cyclone water bath dust collectors, and other devices. Polish the surface of the steel pipe to the specified anchor pattern depth and smoothness by throwing steel sand to meet the coating requirements | ||||
2 | Internal blowing machine | 2 | A. Air volume 36427 cubic meters per hour; | |
B. Wind pressure 0.6MPa | ||||
C. Performance description: It consists of a rotating platform, high-pressure fan, air duct, and walking trolley. Its function is to clean the steel sand that may be brought into the inner wall of the steel pipe during the shot blasting process | ||||
3 | PE coating machine | 2 | 219-2620 | A. Coating diameter ≤ 3620mm |
B. Thickness of anti-corrosion layer 1.5-5.0mm | ||||
C. Single steel pipe length 9m-13.8m | ||||
D. Coating speed 0.3-3m/min | ||||
E. Performance description: It consists of input and output roller conveyors, heating devices, spraying cabinets, extruders, walking devices, dryers, dust collectors, feeders, hoppers, etc | ||||
4 | Intermediate frequency heating cabinet | 2 | 219-2620 | A. Heating diameter ≤ 3620mm |
B. Steel pipe thickness 4.5-32mm | ||||
C. Performance description: Heat the steel pipe before applying epoxy powder to ensure effective fusion bonding of epoxy powder on the pipe wall | ||||
5 | Epoxy powder external electrostatic spraying cabinet | 2 | 219-2620 | A. Coating diameter ≤ 3620mm; |
B. Application rate 0.2-4.8Kg/min | ||||
C. Performance description: It consists of an electrostatic cabinet, a fluidized bed box, a powder tube, a powder gun, a gun rack, an air bag, etc. Epoxy powder is pressurized onto the steel pipe through an electrostatic cabinet, and the powder gun sprays a uniform powder that adsorbs onto the heated steel pipe surface and melts into a specified thickness | ||||
6 | Adhesive extruder | 2 | 219-2620 | A. The maximum coating amount is 2Kg/min |
Performance description: Composed of extruder, walking device, feeder, dryer, heating device, die head, etc. The adhesive is heated into a molten state inside the extruder, and then wrapped in sheets by the die head agent around the steel pipe sprayed with epoxy powder, playing a bonding role between the epoxy powder and polyethylene | ||||
7 | Polyethylene extruder | 2 | SJ-220 | A.涂敷量最大15Kg/min; |
Performance Description: Composed of extruder, walking device, feeding machine, dryer, heating device, die head, etc. Polyethylene is heated into a molten state in an extruder and then wrapped in sheets by a die agent on the surface of a steel pipe wrapped with adhesive | ||||
8 | Water spray room | 2 | A. Passing diameter ≤ 3620mm | |
B. Spray water volume 10-15 cubic meters per hour | ||||
C. Performance description: It consists of a horizontal water pump, vacuum water tank, water pipeline, sprinkler system, etc. Perform cooling and hardening treatment on the just wrapped anti-corrosion layer to ensure its uniformity. | ||||
9 | beveling machine | 2 | 219-2620 | A. Anti corrosion steel pipe processing length 6-18m |
B. Maximum processing diameter ≤ 3620mm | ||||
C. The longest processing length of the pipe end is 250mm | ||||
D. Groove type: V-shaped groove | ||||
E. Performance description: It consists of a bed body, wheel frame, wire wheel assembly, pneumatic lifting device, walking trolley, etc. Its function is to chamfer the anti-corrosion layer at both ends of the anti-corrosion steel pipe, in order to facilitate on-site pipeline docking construction and subsequent pipe mouth anti-corrosion | ||||
10 | Inner wall sanding and rust removal machine | 2 | 219-2620 | A. Steel pipe processing length 9-18m |
B. Processing pipe diameter Φ 508--3620 | ||||
C. Rust removal speed 0.1-2m/min | ||||
D. Performance description: The steel pipe surface is polished to the specified anchor depth and smoothness by throwing steel sand to meet the coating requirements | ||||
11 | Internal wall shot blasting rust removal machine | 2 | 219-2620 | A. Steel pipe processing length 9-18m |
B. Processing pipe diameter ≤ 3620 | ||||
C. Rust removal speed 0.1-1.5m/min | ||||
D. Performance description: The steel pipe surface is polished to the specified anchor depth and smoothness by throwing steel sand to meet the coating requirements | ||||
12 | Activated carbon adsorption box | 2 | TG-16-48 | Airflow of 5000 cubic meters per hour |
It consists of activated carbon adsorption purification device, desorption purification device, adsorption fan, desorption fan, etc. Collect organic waste gas from the production process through air ducts, and use activated carbon to absorb the waste gas, achieving the goal of a good production environment and emission standards |
ADD:Chengnan Industrial Development Zone, Yanshan County, Hebei Province
Domestic phone number:0086-317-6689999
International call:0086-317-6165555
E-mail:9905791@qq.com